Pit 4 Maintenance Update
- Jul 17, 2020
- 1 min read
Updated: Aug 16, 2020
Thanks to sterling work by the fortnightly work party team, Barry and Paul, the path around Pit 4 and Peg 7 have been opened up.
Of serious note, following a member report, a trailing line from a tree just past the red marker post to Peg 1 has been removed. The line had been snagged several times leaving it entangled with three sets of end tackle. Thanks go to Steve for reporting the issue and Dean & Baz for their speedy attendance onsite to launch the societies boat and carryout the removal.